Site fusion is the most expensive metre of pipe on any project — machine hire, qualified operators, weather and inspection all bill by the day. Moving that work into the factory as prefabricated spools cuts site time, and cuts it in a controlled environment where every weld is logged.
We break the isometric into transportable spools, agree the break points with the installer, mark each spool to the drawing, and crate them in installation sequence so the site crew unpacks what it needs next.
Key features
- Isometric broken into transport-optimised spools with the installer
- Every spool marked to the drawing and the packing list
- Crated in installation sequence
- Factory weld logs and test records supplied per spool
- Typical 40–60% reduction in site fusion hours