Skip to main content
The length of the production hall, extrusion lines running down both sides

Resources

Factory Videos

Two short films — one from the yard, one from site — plus a live walkthrough on request.

The stock yard seen from the road, the view a factory tour opens with

Buyers who cannot travel still need to see the plant. Two films are published so far: a walk through the finished goods yard with the moulded fitting range beside it, and a farmland drainage line being laid on site. More go up as we shoot them.

For anything not on film yet, we run a live walkthrough on a video call: our engineer carries a camera through the plant and you direct where it points — into the extrusion hall, the fitting store or the laboratory, whichever you need to see.

Watch

  • HDPE pipe stockyard and fittings

    A walk through the finished goods yard: pipe held by diameter, and the moulded fittings that go out with it.

  • Farmland drainage installation

    Double-wall corrugated pipe laid across high-standard farmland — trench, jointing and backfill on site.

Key features

  • Finished goods yard and the moulded fitting range
  • Structured wall drainage pipe being laid on site
  • Live video factory audit by appointment
  • Extrusion hall, fitting store and laboratory shown on a live call

Need a quote or a spec check?

Send us your drawing, tender document or bill of quantities. Our engineers reply within 12 working hours with pricing, lead time and a container loading plan.