
Renewable projects are built to a tight capital budget on sites with no existing services, so the piping has to be light to handle, quick to join and maintenance-free once buried. HDPE is all three, which is why it turns up across solar, biogas and small hydro scopes.
We supply cable ducting and wash-water lines for solar farms, gas collection and digestate lines for biogas plants, and penstock and cooling pipe for small hydro installations.
Key features
- Cable ducting and module wash-water lines for solar farms
- Biogas collection, digestate and slurry lines
- Small hydro penstock pipe in heavy wall
- UV-stabilised grades for above-ground runs
- Light enough to install without heavy plant on remote sites
